Calculator · 110V / site transformer
Check whether a 110V site transformer can realistically power temporary heaters, dehumidifiers, fans or drying kit without overload or ugly voltage drop.
Calculator · RCD / earth leakage
Estimate cumulative leakage from compressors, dehumidifiers, portable AC, heaters, pumps and long wet leads before stacking everything behind one RCD.
Calculator · generator / kVA
Size a generator for portable AC, dehumidifiers, fans and heaters with a start-current allowance rather than only running watts.
Calculator · extension lead / cable reel
Check whether a coiled, partly unwound or long extension reel is a bad match for a 2kW or 3kW temporary heater.
Calculator · three-phase / phase balance
Allocate single-phase heaters, dehumidifiers, fans and portable AC units across L1/L2/L3 to reduce imbalance and nuisance trips.
Calculator · amps / kW
Convert heater kW into current at 110V, 230V or 400V and check 13A, 16A, 32A and three-phase supply classes.
Calculator · connector / commando plug
Pick the likely connection class for an electric heater: 13A plug, 16A, 32A, 63A or three-phase.
Calculator · sequencing / heater staging
Plan staged heater switching and phase allocation so large temporary heating sets do not hit one supply at once.
Calculator · ventilation / heat loss
Estimate extra heat needed when extract fans, open doors or air changes are dragging warm air out of a workspace.
Calculator · dehumidifier / litres/day
Estimate litres/day capacity from room volume, temperature, humidity and drying target, then check power requirements.
Calculator · desiccant / refrigerant
Choose a dehumidifier type based on temperature, RH, target and site conditions.
Calculator · dew point / condensation
Calculate dew point and cold-surface condensation risk, then decide whether heat, dehumidification or airflow is the first lever.
Calculator · drying / power plan
Combine dehumidifiers, air movers and support heaters into a staged circuit plan for drying jobs.
Calculator · condensate / pump
Check whether a dehumidifier or portable AC condensate route is likely to need a pump or a shorter drain path.
Calculator · drying log / moisture
Create a simple daily drying log with RH, temperature, moisture readings, equipment and circuit notes.
Calculator · ACH / fan
Estimate airflow required for workshops, drying rooms, stores and warehouses by room volume and target air changes.
Calculator · air mover / drying
Suggest count and placement pattern for air movers in a drying room based on wet surface area and room shape.
Calculator · ducting / fan derate
Estimate how duct length, bends, inlet restrictions and outlet restrictions reduce nominal fan airflow.
Calculator · air scrubber / negative pressure
Estimate air scrubber airflow needed to maintain containment or repeated air cleaning in a work zone.
Calculator · destratification / warehouse
Estimate whether destratification fans could reduce heat stacking and improve heater effectiveness in high spaces.
Calculator · portable AC / BTU
Estimate portable AC capacity in kW and BTU/h for offices, plant rooms, events, kitchens and workshops.
Calculator · spot cooling / server room
Estimate spot cooling for server rooms, production lines, events and overheated work zones.
Calculator · start current / AC
Estimate start-current pressure on breakers or generators for portable AC and compressor loads.
Calculator · AC exhaust / ducting
Estimate cooling performance loss from long exhaust duct runs, bends and recirculation risk.
Calculator · portable AC / condensate
Plan tank emptying, gravity drain or pump route for unattended portable AC operation.
Calculator · 13A / 16A
Select a likely temporary connection class based on load current, voltage, environment and duty cycle.
Calculator · RCD Type A / Type AC
A selector aid for AC, dehumidifiers, inverter drives, electronic controls and mixed temporary HVAC equipment.
Calculator · MCB curve / motor start
Estimate whether fan or compressor starting current is likely to be harsh for a B, C or D curve MCB.
Calculator · temporary DB / distribution board
Lay out a temporary board for heaters, drying equipment, fans, portable AC and lighting, with circuit groups and notes.
Calculator · PAT / visual inspection
A practical visual checklist for plugs, sockets, reels, commando connectors and temporary HVAC leads before use.