Guided job flow

Portable AC Event & Server-Room Power Plan

Estimate cooling, start current, exhaust duct losses, condensate handling and generator demand for temporary cooling.

Flow steps

  1. Choose server room, event, office, kitchen or workshop.
  2. Estimate cooling kW/BTU and spot load.
  3. Check compressor start current and generator kVA.
  4. Derate for exhaust ducting and plan condensate.
  5. Export a start sequence and power note.

Tools in this flow

Tool index
Calculator · start current / AC

AC start current

Estimate start-current pressure on breakers or generators for portable AC and compressor loads.

For generator jobs, weak supplies and nuisance MCB trips.

Calculator · portable AC / condensate

AC condensate plan

Plan tank emptying, gravity drain or pump route for unattended portable AC operation.

For overnight cooling, plant rooms and temporary office setups.