Guided job flow

Warehouse Fan & Heater Balance

Link high-bay heat loss, door ventilation, destratification and temporary electric heater power into one plan.

Flow steps

  1. Enter warehouse volume, target temperature and door/ventilation conditions.
  2. Calculate ACH and ventilation heat loss.
  3. Estimate destratification benefit.
  4. Select heater supply and balance phases.
  5. Review fans and heater categories.

Tools in this flow

Tool index
Calculator · connector / commando plug

Heater supply selector

Pick the likely connection class for an electric heater: 13A plug, 16A, 32A, 63A or three-phase.

Useful where heater kW is known but the supply type is not obvious.