Trending electrician tools

UK electrician calculators, rebuilt around temporary HVAC realities.

Cable size, voltage drop, max demand, Zs/R1+R2, circuit schedules and AI panel tools, but with heaters, dehumidifiers, fans, portable AC and temporary distribution built into the workflow.

Calculator · PFC / PSCC

PFC / fault current

Estimate PSCC or PEFC from Ze and voltage, compare against device breaking capacity, and draft a quick test-sheet note.

For competent persons checking prospective fault current, breaking capacity and temporary distribution assumptions.

Calculator · max Zs / MCB

Max Zs checker

Check a measured Zs value against an entered device limit, with optional 80% rule headroom and clear pass/check wording.

For reviewing Zs results on MCB/RCBO circuits before recording or investigating a circuit.

Calculator · CPC / adiabatic

CPC adiabatic

Use the adiabatic equation shape to compare fault current, disconnection time, k factor and CPC size as a planning aid.

For competent review of CPC adequacy where final design still needs current BS 7671 tables and site data.

Calculator · cable correction factor / Iz

Cable correction factors

Stack ambient temperature, grouping, insulation and installation correction factors to see whether corrected Iz still covers load current.

For quick cable-capacity sanity checks before final BS 7671 cable selection.

Calculator · RCD / trip time

RCD trip time checker

Review x0.5, x1 and x5 RCD trip-time readings and produce a clear pass/check prompt for the job file.

For checking recorded RCD results before deciding whether to retest, investigate or replace.

Calculator · insulation resistance / IR test

IR test triage

Turn L-N, L-E and N-E insulation-resistance readings into practical next-step notes for damp circuits, appliances and fault finding.

For electricians reviewing low or borderline MΩ readings without treating a web tool as certification.

Calculator · DB schedule / test sheet

DB/test sheet checker

Paste circuit and test-sheet notes to flag missing Zs, R1+R2, IR, RCD or breaker details and generate a cleaner copyable schedule.

For tightening up temporary DB schedules, EICR notes and job-file records before handover.

Calculator · Zs / R1+R2

Zs / R1+R2

Calculate expected Zs from Ze and R1+R2, or derive R1+R2 from measured Zs for circuit assessment notes.

For competent persons recording or checking circuit test values.

Calculator · EICR / C1

EICR observation coder

Draft C1/C2/C3/FI-style wording for common observations around overloaded sockets, damaged reels, RCD issues and temporary HVAC equipment.

A wording assistant only. It does not issue certificates or decide compliance for you.

AI tool · AI / plug

AI plug/reel visual check

A photo-led checklist for coiled reels, discolouration, cracked plugs, loose strain relief and overloaded adaptors.

Designed around visible signs only, with clear escalation language.

AI tool · AI / EICR

EICR remedial scope

Turn observations into a clear remedial scope, materials prompt and temporary equipment restriction note.

For drafting, not certification.